This case study discusses the successful installation of Redflow batteries into a telecommunications base transceiver site (BTS). The BTS is located in a remote location in Latin America, accessible via rocky road and difficult terrain. The key site issue was an intermittent grid, meaning constant site downtime equating to loss of average revenue per user (ARPU), as well as an unreliable service for the customers of the mobile network operator (MNO).

Download the Case Study