Redflow-telco-case-study-Latin-America-Sep-17-PR-1

Redflow telco BTS case study from Latin America

This case study discusses the successful installation of Redflow batteries into a telecommunications base transceiver site (BTS). The BTS is located in a remote location in Latin America, accessible via rocky road and difficult terrain. The key site issue was an intermittent grid, meaning constant site downtime equated to a loss of average revenue per user (ARPU), as well as an unreliable service for the customers of the mobile network operator (MNO).

Click here to download Redflow’s telco case study from Latin America.

Redflow_RGB300

+ 61 7 3376 0008
[email protected]

Be the first to know

Sign up to our newsletter today.

This field is for validation purposes and should be left unchanged.

© Copyright Redflow Limited 2024. All rights reserved.

Keep in touch. Follow us and stay up to date.

   

Hey there, this is the default text for a new paragraph. Feel free to edit this paragraph by clicking on the yellow edit icon. After you are done just click on the yellow checkmark button on the top right. Have Fun!